When this bridge was started, my brother in law was a Foreman for the construction. My cousin also worked on this bridge.
I would ride in with them with a single break open Shotgun, and I would hike to the bottom. This was before it was
Illigal to do so. Then before
Their shift was up. I would hike back up. The bridge was completed in 1974.
I was 16-17 years old when started.
480 ft elevation change.
Hunted quail, and back then they were abundant.
http://www.highestbridges.com/wiki/index.php?title=Pine_Valley_Creek_Bridge
I would ride in with them with a single break open Shotgun, and I would hike to the bottom. This was before it was
Illigal to do so. Then before
Their shift was up. I would hike back up. The bridge was completed in 1974.
I was 16-17 years old when started.
480 ft elevation change.
Hunted quail, and back then they were abundant.
http://www.highestbridges.com/wiki/index.php?title=Pine_Valley_Creek_Bridge
Last edited: