from the hunter meeting in August:
252 acres to be flooded on opener
Three hundred and thirty-nine acres of watergrass were irrigated this year.
Two hundred and forty-six acres of swamp timothy was irrigated.
Waterfowl opening weekend hunter quota is expected to be
10.
Quota will increase as more wetlands get flooded. Maximum quota will be up to 40 hunters.
Thirty acres safflower was planted and irrigated to maturity. Additionally, 45 acres of volunteer wheat was irrigated to maturity resulting in good seed production.
Pond 8 was seeded with barley and will not be flooded this year.
There continues to be issues with rank aquatic vegetation growing in the cement delivery canal. Rank vegetation allows for sediment build-up and reduces capacity of the canal.
Nutria were discovered on the area early summer of 2018. The area continues to be monitored for nutria.
Last Years Opener - 3 hunters got 6 ducks (spoons and mallard). Every year is different...so it's just up to you and your adventurous spirit..
You might Call and ask to talk to Steven Miyamoto Manager (209) 826-0463 See what he says